Washington Gas Work Schedule

Washington Gas is continuing to perform work throughout Town as part of their legacy pipe replacement. When necessary, the Washington Gas contractor will be using traffic controls when shutting down a lane of traffic. Residents may experience some delays during this work.

The work is dependent upon weather and availability of homeowners; therefore, this schedule may change frequently. Below is the tentative schedule from 7.5.2021 to 7.23.2021.

MONDAY                 WEDNESDAY                     THURSDAY                         FRIDAY
July 12                         July 7                                    July 8                             July 9
2300 Cheverly Ave.       2204 Cheverly Ave.                 3011 Lake Ave.                  2816 Parkway
                                                                             3116 Lake Ave.                  2814 Parkway
July 19                        July 14                             2419 Parkway
2712 Belleview Ave.       2316 Cheverly Avenue